← All jobs

Location
Hanging Rock, OH
Work mode
On-site
Type
full-time
Level
mid
Posted
Mar 16, 2026

Job description

ABOUT US Holder Construction is a nationally recognized leader in the construction industry, consistently ranked among the top firms on ENR’s Top 400 Contractors list. We are a performance-driven company that believes in rewarding excellence and investing in our people. Our structured career development program empowers associates to grow quickly into expanded roles and responsibilities based on merit. With operations throughout the United States, w e offer a highly competitive compensation and benefits package, including: Annual bonus program Paid time off Health, dental, vision, and life insurance 401(k)-retirement plan Night and swing shift differential pay for select roles About the Role We are looking for a Scheduler to join our Scheduling team in our regional office in Hanging Rock, OH. This is a full-time, in-person position. Key Responsibilities Build and manage baseline schedules using CPM best practices, including detailed WBS for schedules with 2,500+ activities. Run weekly meetings to update construction schedules via job walks and superintendent live updates. Create, maintain, and edit layouts in Primavera P6 to efficiently update schedules, generate reports, and analyze critical paths. Identify variances from previous baselines and filter work by trades, time frames, or areas to create custom reports. Resource-load baseline schedules to track earned value metrics and maintain cost and duration accuracy. Create Time Impact Analysis (TIA) reports using historical data from CPM tools. Use Excel to analyze large data sets and multiple schedules. Interface directly with clients to address concerns and requests. Manage mid-month and end-of-month deliverables, including .xer files, critical path reports, full schedules, 6-week look-ahead reports, and schedule narratives. Mentor, train, and assist in the professional development of junior schedulers. Qualifications Required: Preferably 5+ years of commercial construction management and/or scheduling experience. Familiarity with the construction process to identify and discuss potential issues and suggest mitigations. Ability to work with minimal supervision. Outstanding written and verbal communication, interpersonal, and time management skills. Experience coordinating schedule development and management with project supervision, owners, and subcontractors/vendors. Ability to work collaboratively in a large team environment. Preferred: Experience mentoring and training junior schedulers. #LI-DO1 Holder is committed to Equal Opportunity Employment (EOE). ​ Substance abuse testing and a background screening is a condition of employment and Holder Construction does not sponsor applicants for immigration status or benefits.

More jobs at Holder Construction

All jobs at Holder Construction →